Loading OBPrint…
Skip to content
OBPrint
Book a demo

Blog · Shop operations

A print shop artwork approval checklist: from proof to production

Use this artwork approval checklist to keep proof versions, print placement, customer changes, and production instructions clear before a job reaches the press.

OBPrint team · October 17, 2026

A useful artwork approval process records which version the customer approved and gives production a clear path to that version. Before releasing a print job, check the design, placement, dimensions, colors, garment details, and any instructions that affect the finished order.

The goal is not a longer email. It is a clear answer to “What exactly are we making?” that the customer, office, and crew can all find.

Separate the order decision from the artwork decision

A customer agreeing to a price is not necessarily approving the artwork. Likewise, approving a design does not resolve a changed quantity, delivery date, or charge.

Keep those decisions distinct in your process. When a revision changes the work or price, review the order as well as the proof. Do not leave the press operator to interpret whether an email saying “looks good” applies to the original design or the latest revision.

Check these details on the proof

DetailWhat the reviewer needs to see
Design versionA clear version or revision reference.
GarmentThe relevant style and color, with exceptions called out.
Print locationFront, back, sleeve, or another clearly identified area.
DimensionsIntended print dimensions rather than a mockup alone.
PlacementThe agreed reference point and any special positioning instructions.
ColorsThe agreed color references and any limitations discussed with the customer.
WordingNames, dates, spelling, phone numbers, and other details that can be overlooked.
VariationsDifferent artwork, placements, or names within the same order.

A mockup helps someone picture the result, but a visual alone can leave measurements ambiguous. Record dimensions explicitly where the job depends on them. Screen appearance also should not stand in for an agreed physical color reference when that matters to the customer.

Give changes a clear return path

Ask the customer to describe the requested change against the proof being reviewed. Make the revision, identify the new version, and request approval of that version.

If a change comes by phone or an unrelated email, add it to the job record before the job moves forward. Otherwise, the person who took the call becomes the only source of the updated instructions.

Avoid calling multiple files “final.” A version number or another consistent naming convention makes it easier to distinguish the approved work from older options.

Check readiness before sending the job to the press

Artwork approval is one readiness check. It does not establish that garments have arrived, quantities have been counted, or production setup is complete.

Before release, have the responsible person confirm:

  • The approved artwork version is identifiable and accessible.
  • The work order agrees with the approved garment, location, and decoration details.
  • Changes affecting quantities, price, or due date have been reviewed separately.
  • Required materials and production preparation have been checked.
  • Any exception has a named owner and a clear next action.

For example, if a customer approves the back print but is still revising the front, record that distinction. Do not let a general “approved” note conceal an unresolved part of the job. This is a process recommendation; check how your chosen software represents partial approvals.

How OBPrint supports proof review

OBPrint supports customer proof review through a link, with approval or a request for changes. Proof versions and job-linked records help staff locate the artwork and its review history. See proofs and work orders for the workflow.

The team still needs to review changes and decide whether the job is ready for production. Software can keep the record available; it does not replace checking the physical materials or the customer's requirements.

If you are evaluating a new system, include a proof revision in your real-job software test. Confirm that a crew member can find the right version without having watched the office enter it.

Common approval questions

Is an email approval enough for our workflow?

An email may record a customer's response, but your team still needs to identify which artwork and job details that response refers to. Keep the response with the relevant version and order. A vague reply detached from its proof is difficult for another staff member to interpret.

What if the customer changes artwork after approval?

Pause the affected work, assess what the change means for preparation, price, and timing, and obtain approval for the revised work before continuing. Keep the earlier version in the history so the team can understand what changed.

Where should we start improving the process?

Take one recent job that required extra explanation. Identify the missing detail and add it to your proof or release checklist. If you want to see how the record works in OBPrint, bring that example to a demo.

Run the next real job
through OBPrint.

No six-month migration. Start with the next job through the door and let the team run it.

No credit card required for the Full Run trial.